How long does it take to develop an app? Most people who ask already have a date in mind: a season, an event, a contract that starts on a set day, a funding milestone, or a launch the marketing is already planned around. The answers they find count in months, and a date like that rarely leaves months to spare.
This guide is written for that reader. It explains what the answer depends on, where the weeks of a first release go, what adds weeks and what takes them out, and how to plan backwards from the day you need. The figures in it are the ones our studio publishes for its own first release, the length and the price side by side.
How long does it take to develop an app, and what decides it?
Published ranges count months because they count whole products: every screen, every kind of user and every feature anyone has asked for. That is a fair answer, but to a question that few owners with a date are actually asking.
The useful question is narrower: how long until one journey works on both phones, and what else has to be true by then? A journey is one complete thing a customer does from start to finish, such as booking an appointment and paying for it.
In mobile app development, the journey is the unit worth measuring, because it is the smallest piece of an app that a customer can actually use. A date can be met with one journey that works properly. It cannot be met with a pile of screens that never quite join up. The rest of the answer, what else has to be true by your date, is mostly not programming at all, and it often decides more than the code does.
Calendar time that is not code
A large part of the calendar of a first release goes on work that is not programming, and some of that work sits with the business rather than with the people building the app. The calendar has to make room for each of these:
- The business’s own decisions take time: which rules apply, what things cost, and who signs off the wording on each screen. A question that stays open holds up every piece of work that depends on it.
- Developer accounts with Apple and Google have to exist in the business’s name before anything can appear in either store. Opening them involves checks on the stores’ side, and those checks run to the stores’ schedule rather than yours.
- The server side, meaning the computer behind the app that stores the data and does the work a phone cannot, has to be ready to answer. If one already exists, the app has to be connected to it; if not, it has to be built as well.
- Testing on real phones has to happen before any customer sees the app, because something that behaves on a desk can still misbehave in a customer’s hand.
- The store’s own review comes at the very end: Apple and Google each check an app before it goes live, on a timetable of their own.
We do not promise how long a store review will take: nobody can, and a promise of that kind is a guess made with your launch date. None of the items on this list gets a length in this guide, because each one depends on people outside the build. The weeks that sit with the business are as real as the weeks spent writing code, and they deserve the same room in the plan.
Where the weeks of a first release go
How long does it take to build an app that does one job well, on both phones? Our first release takes eight weeks, from the first call to a build your customers can install, with one journey working end to end on iOS and Android.
Eight weeks is the length of the work, not a launch date. Between a finished build and the day customers can download the app sits the store’s review, and nobody controls that part of the calendar.
The middle of those weeks, weeks four to six, is the hard half. It is where the money is handled, where notifications are set up and where the app asks the phone for permissions, such as access to the camera or to the customer’s location. Integration tests, which are automated tests that drive the real app on a phone, grow alongside on a real device. At the end of that stretch the journey works end to end on both platforms, including its failures: the moments when a step goes wrong, and not only the path where everything goes right.
This order matters when you are working to a date. The screens you can see arrive early, and they can make a project look nearly finished. The parts that decide whether the app can launch at all, such as taking payment and asking for permissions, arrive in the middle.
A plan judged by its screens can feel ahead of schedule until the hard half shows how much is left. The better measure of progress is the journey itself: can a customer get from its first screen to its end, and what happens when a step fails?
What adds weeks, and what takes them out
How long does it take to develop a mobile app when the brief is bigger than one journey? It takes longer, and the reasons usually show before any work starts. These add weeks:
- A second journey brings its own screens, rules and failures, and it has to work end to end on both phones as well.
- Money moving between two sides, where the app takes payment from one group of people and pays another, needs screens, accounts and rules for both of them.
- A server that does not exist yet has to be designed and built alongside the app, which makes it a project of its own.
- Answers that wait days stop the work that depends on them, and the lost time is hard to win back.
- Changes once the build is under way mean redoing work that was already finished, and the calendar moves with them.
Each of those has an opposite. These take weeks out:
- One journey keeps the calendar short: choose the single thing that must work by your date, and leave everything else until after it.
- One person who decides saves time, because a question then gets a yes or a no without waiting for a meeting.
- Accounts opened early remove a common stall: the store accounts and any access to existing systems are ready before the build begins.
An app development timeline example, planned back from your date
Take a date that cannot move, such as the start of a season, and plan backwards from it instead of forwards from today. Read the list from the top down: each step has to be complete before the one listed above it.
- Your date sits at the top: the day customers must be able to use the app, written down with the reason it cannot move.
- Room for the store’s review comes just before it. Nobody controls how long the review takes, so this room should be generous rather than tight.
- The eight weeks of the first release come before that, ending with one journey that works end to end on both phones.
- Settling the journey and the decisions behind it comes before the eight weeks: agreeing which journey it is, then the rules, prices and wording that only the business can decide.
- Today is where you stand, and whatever lies between today and the start of that work is your margin.
Worked backwards, the question “How long does it take to develop an app?” turns into a more useful one: does your date leave room for every step on this list? If it does, the margin is worth protecting, because the steps that sit with the business can run long too.
If the date comes before the plan, the choice is to cut the release down to one journey, if it is not there already, or to move the date. Squeezing the testing or the room left for review is not a real alternative; it only moves the risk onto your launch day.
The price of a first release
A first release on both stores, with one journey working end to end on iOS and Android in eight weeks, starts from $19,000. The figure covers that scope and nothing larger. A product with several journeys, or with money moving between two sides, runs further than eight weeks and is not priced here.
The work is paid for in stages. A stage grows only when the scope does, and a change of scope comes with its own quote before any work on it starts. You can stop after any stage, and what has been built stays with you.
The things that move the price of any app are a subject of their own, set out in a separate guide to app development cost. This guide sticks to the calendar, so they are not repeated here.
Your date, and the journey that must work by it
How long does it take to develop an app for the date you have in mind? Start with that date and the one journey that must work by it, written down in a few plain lines. A note like that is the most useful brief in mobile app development, because it tells whoever reads it what has to work, and by when.
When the note is ready, send it our way. Within 12 hours you have a basic estimate in return, with a range, an outline of what the first version would contain, and the things that would move it. If the date turns out to be too close, it is better to learn that now than halfway through a build.